21 August 2011
e-conomic has completed a performance upgrade of its system on Sunday (August 21) from 00:01 to 06:00 CET. This upgrade required the system to be shut down in this period, which means that e-conomic was unavailable to all customers.
Please note that if your integrations to e-conomic do not support post-synchronization of data, any data exchanged with e-conomic in the upgrade period might be lost.
All systems are now back to normal operation and fully available to all customers.
No Comments » |
Performance & availability |
Permalink
Posted by Claes Meldal
20 August 2011
e-conomic is performing an upgrade of its system during a 6-hour time span on Sunday (August 21) from 00:01 to 06:00 CET. Therefore you cannot log on to e-conomic and use the system in this period.
Please note that if your integrations to e-conomic do not support post-synchronization of data, any data exchanged with e-conomic in this period might be lost.
After the 6-hour upgrade, all systems will return to normal operation at 06:00 CET on August 21.
No Comments » |
Performance & availability |
Permalink
Posted by Claes Meldal
18 August 2011
e-conomic has scheduled a performance upgrade involving six hours of downtime this coming Sunday (August 21) from 00:01 to 06:00 CET. This upgrade will further enhance system failover options and minimize system downtime in the future.
Please be aware of the following:
- You will not be able to use e-conomic at all during this 6-hour period
- If your integrations to e-conomic do not support post-synchronization of data, any data exchanged with e-conomic in this period might be lost
After the 6-hour upgrade, all systems will return to normal operation and be available for all customers.
No Comments » |
Miscellaneous, Performance & availability |
Permalink
Posted by Claes Meldal